Abstract
Germanyâs nuclear phase out and an increasing share of fluctuating RES production amplifies the North-South congestion problem in the German electricity grid. But congestion management becomes a serious issue not only in the German but in the whole European electricity system as German wind production does not only affect the German grid. In theory it is well established that nodal pricing is the most efficient congestion management method. In literature the PJM well-established nodal market design often serves as a reference and is viewed as benchmark. To benefit from experiences made in the U.S. the transfer of the PJM market design to Germany could be advantageous. This article compares key elements of the generation mix, the network structure, the cross-border interconnection as well as the congestion situation of both electricity markets to assess potentials and impediments for an implementation of the PJM nodal market design in Germany. We show that both markets are less different in structure than expected but that large differences in performance respectively in congestion frequency lead probably to much lower welfare gains. Transfer of the PJM market design to Germany is possible in principle, but adjustments to RES would be ad-vantageous.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.