Abstract

This study investigated the impact of environmental engineering on existing venues, venues and operations management. First, the literature analysis and field survey method are used to summarize the current situation of the venue. Then, 420 questionnaires are collected for statistical verification analysis, combined with the interview method to understand the deepest feelings of the people, and finally discussed with a multi-inspection method. The researcher believes that although environmental construction can improve infrastructure and human quality of life, which, after all, are experiment after completion. If, before construction, a good communication channel; obtaining consensus from the people and businesses; acquiring precise information; spraying water to reduce dust; increasing the height of the peripheral fence; planning a substitutive plan; avoiding crowds; reducing mistakes in the process; avoiding influencing the water and electricity supply and soil, water, and environment sanitation; and planning for a substitutive route and parking space with subsidy for damages are not possible, a negative image will be produced, willingness to spend will be reduced in the people due to the blocking of the view by the building (75%), the billboard will lose its functionality (63.2%), and inconvenience will be caused by the line of movement (75%) and parking space (55.9%), which are not helpful for development.

Highlights

  • National public construction revitalizes the economy and improves the development status (Lu 2019; Yu 2005), increases job opportunities, and promotes universal health (Lin 2019)

  • Facility management requires professional cooperation, but after the Taiwan government builds public construction, the commission is managed by local government units

  • The management personnel of local government agencies depend on familiarity with the national examination books

Read more

Summary

Introduction

National public construction revitalizes the economy and improves the development status (Lu 2019; Yu 2005), increases job opportunities, and promotes universal health (Lin 2019). On the basis of the “One Town One Product” policy in Taiwan, various public construction projects such as stadiums have been proposed. This provides safe and suitable recreational environments for the public, thereby enhancing overall public construction development. The management personnel of local government agencies depend on familiarity with the national examination books. They can be appointed as public officials. Such a manpower source is only familiar with the contents of the book, seriously lacks professional technology and practical experience, and is not competent

Objectives
Methods
Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.