Abstract

Worldwide, governments use environmental impact assessments (EIAs) to manage the environmental impacts of industrial activity. EIAs contain baselines that describe the specific environment where the project would go, and impact evaluations that identify ways to eliminate, reduce, or compensate the environmental harms the project would have. Although EIA baselines promised to democratize and improve decision-making, in practice, many affected communities, environmental activists, and scholars of EIAs find that baselines often obscure certain ecological impacts. Drawing on science and technology studies and environmental history, I reflect on why this happens and propose that it results from the ways in which EIA baselines reproduce modernist views of economic growth and progress. I analyze EIA baselines as a “memory practice” which meet the needs of the present by projecting a timeless, static past to be preserved. This naturalization of modernism can be challenged through two correctives: to compare projects rather than natures in EIA baselines, and to document existing and potential forms of “rubble” resulting from industrial activity. I illustrate these arguments with the case of glaciers and efforts to protect them from the impacts of the Pascua Lama gold mine located in the high-altitude Andes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.