Abstract

Digitization has dramatically facilitated the development of internet data centers (IDCs), which have become necessary demand response resources for distribution networks. To improve equipment utilization, integrated coordination of IDCs, photovoltaics, energy storage systems, and flexible substations is essential. This also ensures power supply reliability and the operational economy of IDC park. This paper proposes a distributionally robust planning method for an IDC park considering operational economy and reliability. First, a coordinated planning model of an IDC park is proposed with multiple resources, in which the workload dispatch of the IDC is incorporated under fault conditions. The reliability index of the IDC park is designed to quantify its reliability cost. Then, considering the fluctuation of distributed generators and workload, a distributionally robust planning model is established. A planning scheme for the IDC park under the worst scenario probability distribution is obtained. Furthermore, the influence of uncertainties on the planning scheme is analyzed. Finally, a practical data center park is used for case studies. The established planning scheme effectively balances the operational economy, reliability, and planning conservatism.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.