Abstract

Distribution transformer secondary faults are shown to be potentially difficult for a primary interrupting device to clear. Evaluation test programs, therefore, should include this type of fault-interrupting test. Secondary fault recovery voltage data presented is derived from synthetic techniques, field interrupting tests and laboratory interrupting tests. TRV frequency is confirmed to be inversely proportional to the transformer voltage rating, directly proportional to the one-half power of kVA rating, and dependent upon transformer and system grounding connections. The trend toward lower transformer impedances may create problems for interrupting devices since TRV frequencies and the resultant rates of rise of recovery voltage are higher. Laboratory circuits using typical distribution transformers can be set up to be equivalent to field conditions and are satisfactory for exploring the adequacy of interrupting devices for clearing transformer secondary faults.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.