Abstract
This study investigated a reinforced concrete specimen that had deteriorated in an artificial environment for 2years. The steel/concrete interface and corrosion-induced cracks were observed by SEM to investigate the millscale on the rebar surface and the distribution of rust. The millscale was not further oxidised before the surface cracking of the concrete cover. The penetration of corrosion products into concrete and the formation of a corrosion layer proceeded simultaneously. The rust did not fill the corrosion-induced cracks in concrete. Instead of the three-stage model, a two-stage model is proposed to describe the concrete cracking process induced by steel corrosion.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.