Abstract

This paper investigates the multistage expansion planning problem of a distribution network considering reliability. Thus, the best alternative, location, and installation time for the candidate assets are identified while jointly accounting for economic and reliability aspects. As a major salient feature, the conventional simulation-based reliability assessment is equivalently implemented through algebraic expressions whereby the effect of the network topology is explicitly represented by decision variables of the optimization process. For expository purposes, the focus is placed on the expected energy not supplied, which is a widely-used metric for reliability assessment. The resulting optimization problem is cast as an instance of mixed-integer linear programming. Hence, unlike existing heuristic and metaheuristic solution techniques for reliability-constrained distribution system planning, the proposed approach is finitely convergent to the optimal solution and can be readily implemented using commercially available software. Simulation results show the effective performance of the proposed methodology.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.