Abstract

The existing power system does not have a unified grid resource management model. The basic data of equipment assets cannot be stored, managed, and maintained in a unified manner. The production systems of different departments are developed by different manufacturers at different times, which leads to the problem of production data silos and high maintenance costs. To solve this problem, a grid resource business middle platform based on State grid-corporation public data model (SG-CIM, CIM) model is designed in this paper. Firstly, the concept and core technology of the middle platform in the power grid resource business are introduced. Then a dynamic data migration strategy based on the FA algorithm is proposed. Finally, the model based on SG-CIM and the application scenario of power transmission and distribution are built and its effectiveness is analyzed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call