Abstract

Heterogeneous Networks of Workstations (NOWs) offer a cost-effective solution for parallel processing. The completion time of a parallel task over NOWs depends on how the task is divided and distributed among the heterogeneous workstations. In this paper we present a distribution scheme which attempts to minimize the task's completion time over a heterogeneous NOWs. The scheme is based on the idea of distributing fixed time slices of work as opposed to fixed work slices. Our simulations show that the proposed scheme outperforms both fixed and variable work distribution schemes commonly in use. The scheme is very simple and requires no active monitoring of the network. Furthermore it is adaptive and copes very well with the changes in background loads on workstations and network interference.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.