Abstract

Cognitive femotcell networks can opportunistically access the licensed spectrum to enhance spectrum utilization. However, interference management plays a crucial role to effectively utilize the spectrum. In this paper, we consider the joint resource allocation and power control problem for an uplink transmission for a network consisting of a licensed macrocell and multiple cognitive femtocells. Furthermore, our problem imposes crucial constraints of both cross-tier interference for macrocell base station and quality of service for femtocell user. The joint problem is shown to be mix-integer nonlinear nonconvex optimization problem, which is NP-hard. To solve this problem efficiently, we employ a scheme consisting of two distributed algorithms. Numerical results show that the proposed scheme converges to the optimal power and resource allocation with a fast convergence speed. Additionally, our scheme guarantees the interference threshold at MBS and outage QoS for all cognitive femtocell users.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call