Abstract
To enable resilient manufacturing, production control systems must be able to adapt quickly and flexibly to unexpected changes. Motivated by Industrie 4.0, multi-agent systems offer a promising approach to meet these requirements. This paper presents a method for distributed production control that enables production entities to make optimal decisions regarding capacity utilization and the compliance of delivery dates in real-time despite disruptive events. Based on a multi-agent Markov Decision Process, production entities are modeled as autonomous software agents that can solve Flexible Job-Shop Problems through message passing. The performance of the proposed method is evaluated in a simulated production environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.