Abstract

This paper considers the distributed permutation flowshop scheduling problem (DPFSP) which is an extension of permutation flowshop scheduling problem (PFSP). In DPFSP, there are multiple parallel factories instead of one factory as in PFSP. Each factory consists of same number of machines, and jobs can be processed in either of the factories to perform all necessary operations. This paper considers DPFSP for minimizing the total completion time objective. An MILP formulation is developed to find the optimal solution. To solve the problem, a metaheuristic, tabu search (TS) is proposed. Numerical experiments are performed on benchmark problem instances from the literature, and results of the proposed method are compared with current metaheuristics in the literature for this problem. The tabu search outperforms all existing metaheuristics in terms of solution quality.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.