Abstract
This paper addresses the scheduling maintenance operations for a set of geographically dispersed production equipment. We consider various equipment subject to uncertain failures that need to be monitored and repaired by a central maintenance workshop (CMW). We focus on the associated preventive maintenance actions, which require optimal scheduling. A mobile maintenance workshop (MMW) aims to transport all the resources to systematically replace the equipment with spare parts provided by the CMW following the predefined schedule. We propose a general framework and a model to minimize the maintenance and routing costs while optimizing equipment reliability. The novelty of the proposed model is the reduction of computation time through the proposition of heuristic methods while considering capacity constraints and various types of equipment. We perform several instances of problems in the oil and gas field. The studied approach optimizes the location of the CMW and the capacity of the MMW, solving the NP-Hard Problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.