Abstract

As a result of deregulation, increased use of dispersed generation requires revisiting in management and operation of distribution network. Selection of optimal network topology incorporated with the optimal use of dispersed generation and retail market including real and reactive power. Minimisation of related costs and satisfying technical and physical constraints is also the key issue to concentrate. This paper presents a detailed survey of the work done in the field of DG planning. The task of DG planning can be broadly classified into two sections 1 framing the suitable objective function 2 optimising the objective function. This paper presents papers/literature on both the issues taken into consideration of the deregulated electricity markets. There are nearly 57 citations referenced in this bibliography.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.