Abstract

The operation cost waste in the charge and discharge process cannot be ignored for islanded microgrids with energy storage units. Different from the economic dispatch methods focused on the power pricing and bid coefficient in the tertiary control layer, this paper designed a power management algorithm for the economic operation of energy storage units in the secondary control layer. The strategy is devoted to minimizing the total charge power cost of energy storage units while satisfying the constraint of power balance. Meanwhile, the maximized allowable delay bounds were derived to guarantee the communication network reliability when against random time delays. The system stability was analyzed by the Lyapunov functions. Finally, the numerical simulations on the modified IEEE 30 feeder model verify the superiority of the provided algorithm.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call