Abstract

In the present paper, the concepts of chaos and nonlinear dynamics are briefly introduced and the tools used in the characterization of a chaotic or nonlinear system are discussed for studying the performance of dispatching policies in manufacturing systems. The scheduling of a simple manufacturing system with the help of common assignment rules has been simulated first. The results are studied and analysed with the help of time-delay plots. Some conclusions are drawn and, based on them, a new method of scheduling is proposed. The method is tested against conventional rules and the results are evaluated and discussed, specifically by addressing practical and generalization issues.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.