Abstract

The article presents the results of work on dismantling the large installation equipment of Research Building B at the Bochvar High-technology Research Institute of Inorganic Materials (Bochvar Institute). The works were carried out as part of Building B preparation for decommissioning. The purpose of dismantling the large-sized capacitive equipment was to reconstruct the large installation site for managing radioactive waste generated during Building B decommissioning. The works on decommissioning a radioactively contaminated building within a densely populated district of megalopolis were carried out for the first time. The characteristics of the large-sized capacitive equipment are presented. Radioactive contamination of the capacitive equipment is determined by long-lived a-emitting isotopes: 235U, 238U, 239Pu. The sequence of works on dismantling the radiation-contaminated capacitive equipment includes preparatory work, dismantling the tank piping, localizing radioactive contamination of the external surface of the equipment as well as dismantling and moving it into a transport container. Dismantling and decontamination of the large-sized capacitive equipment was carried out by the Bochvar Institute Decommissioning Department. The following tools were used during the works: (1) a mobile foam decontamination facility to perform decontamination works and (2) a mobile high pressure facility to apply localizing and decontaminating film coatings. The tanks were dismantled by means of low-spark tools, i.e., reciprocating saws. Crane runways were made in order to move the dismantled equipment into transport containers: the movement was carried out with the help of a winch. The main results of dismantling and decontaminating the radioactively contaminated tanks are the dismantling of four units of long-length column-type equipment with heights from 4.2 to 6.4 m and 26 units of capacitive equipment (maximum capacity = 8 m3) as well as decontamination of the internal surfaces of radiation-contaminated equipment (decontamination factor = 25–70). As a result, the activity of the accumulated radioactive waste was reduced (the RW class was changed from 3 to 4). The main conclusion regarding the managment of large-sized radiation-contaminated tanks during Building B decommissioning is as follows: the works were organized and carried out at a high technical level, using modern decontamination and dismantling equipment and modern methods to ensure work safety at the Bochvar Institute site in the city of Moscow.

Highlights

  • Research ArticleDismantling and decontamination of large-sized radiation-contaminated equipment during Research Building B decommissioning at the Bochvar Institute site*

  • Completed in 2015, the Federal Target Program “Ensuring nuclear and radiation safety for 2008 and for the period up to 2015” was an example of a systematic approach to ensuring the safety of nuclear facilities (Order No 484-p 2007, FTP NRS-2 Archives)

  • One of the FTP NRS objectives was to reduce radiation hazards of enterprises located in populated areas (Federal Law of the Russian Federation)

Read more

Summary

Research Article

Dismantling and decontamination of large-sized radiation-contaminated equipment during Research Building B decommissioning at the Bochvar Institute site*. A.A. Bochvar High-technology Research Institute of Inorganic Materials (Bochvar Institute) 5-a, Rogova str., Moscow, PoB 369, 123060, Russia. Academic editor: Yury Kazansky ♦ Received 1 March 2019 ♦ Accepted 27 April 2019 ♦ Published 17 May 2019

Introduction
Brief description of removed equipment
Pulsation unit
Removal of the radiationcontaminated capacity equipment
Equipment decontamination
Conclusion