Abstract

This paper presents heat and power efficiencies of a modeled PEFC system and the methods used to create the system configuration. The paper also includes an example of a simulated fuel cell system supplying a building in Sweden with heat and power. The main method used to create an applicable fuel cell system configuration is pinch technology. This technology is used to evaluate and design a heat exchanger network for a PEFC system working under stationary conditions, in order to find a solution with high heat utilization. The heat exchanger network in the system connecting the reformer, the burner, gas cleaning, hot-water storage and the PEFC stack will affect the heat transferred to the hot-water storage and thereby the heating of the building. The fuel, natural gas, is reformed to a hydrogen-rich gas within a slightly pressurized system. The fuel processor investigated is steam reforming, followed by high- and low-temperature shift reactors and preferential oxidation. The system is connected to the electrical grid for backup and peak demands and to a hot-water storage to meet the varying heat demand for the building. The procedure for designing the fuel cell system installation as co-generation system is described, and the system is simulated for a specific building in Sweden during 1 year. The results show that the fuel cell system in combination with a burner and hot-water storage could supply the building with the required heat without exceeding any of the given limitations. The designed co-generation system will provide the building with most of its power requirements and would further generate income by sale of electricity to the power grid.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call