Abstract

Discussion on “Recent progress in the design of the high-voltage overhead lines of the British grid system” and “Cable terminations” before the North-Western Transmission Group, at Manchester, 19th March, 1946

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call