Abstract

This paper has a preliminary discussion of viscose wastewater treatment, proposes the primary materialization treatment of viscose wastewater through experimentation and makes a contract analysis of the two technological processes of the sludge dehydration, thus summarizes the combination treatment of the primary materialization and plate and frame filter press for the viscose wastewater and sludge.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.