Abstract

Abstract This paper deals with control of industrial systems which can be depicted by timed event graphs. A methodology and software tools are presented to allow engineers to implement automatically controllers in PLC. Three steps are needed and recalled: the modelling of the system in max plus algebra, the design of the controller and the implementation in a Supervisory Control and Data Acquisition (SCADA) system. An example on a real system is given to illustrate these steps.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.