Abstract
Innovation in comminution is expected to continue unabated to address the inefficiencies that are inherent in comminution circuits. The rotary offset crusher (ROC) is a new comminution device with a promising performance potential in terms of throughput due to the enhanced speed of transportation induced by the centrifugal force of the discs. However, the processes driving the comminution of particles trapped in the conical space between the two discs of the crusher are not fully understood. To gain a better insight into the comminution process in this device, discrete element modeling (DEM) simulations were conducted to study the breakage of a single particle for the crusher operated under two different dynamic conditions, i.e., (1) a stationary top disc and (2) both discs rotating at the same speed. For both scenarios, the speed of the discs was varied between 550 and 2350 rpm. Experimental testwork was also conducted with the laboratory prototype to generate the data that were used to calibrate the breakage parameters of the Ab × t10 breakage model. Simulations were performed using polyhedral UG2 ore particles that were generated with the in-built particle generator in the DEM simulator. The simulated ROC, which is operated with both discs rotating, outperformed the ROC with a stationary top disc in terms of the specific input energy and throughput. The crusher with a stationary top disc is characterized by high shear forces (suggesting a higher wear rate), specific input energies greater than 1 kWh/t, and low throughputs (<50 kg/h). The ROC operated with a stationary disc is not recommended for hard rock applications due to expected excessive wear of crushing surfaces and higher energy consumption. The freewheeling discs are recommended, but there is scope to optimize the crusher performance in terms of the power draw, size reduction, and throughput by manipulating the difference between the speeds of the discs. There is also scope to optimize the crusher performance when it is simulated with many particles. Once the full performance potential of the ROC is established, it will then be important to benchmark it against the existing crushers in the minerals industry as well as other industries where crushers are used.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.