Abstract

The discovery well for the Nembe Creek field in the coastal swamp of the Niger delta was drilled in 1973. Average recoverable reserves have risen to over 600 million bbl after the drilling of 30 wells. Nearly one-third of the wells drilled have been proposed on the basis of direct reflection seismic support, principally in the form of seismic structure mapping and cross sections. In addition, lateral predictions on the basis of true amplitude impedance data have been made for two appraisal wells. The timely acquisition and interpretation of sufficient seismic lines in an area of complex structure, but good reflection quality, have permitted the drilling of long step-out appraisal wells, leading to early delineation of field limit and rapid growth of proved reserves. End_of_Article - Last_Page 502------------

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.