Abstract

Very fast transient overvoltages (VFTO) generated in a gas insulated substation (GIS) during disconnector switching operations are one of the major concerns in insulation design of the GIS. Such over voltages can cause malfunctioning of the protection and control circuits in addition to initiating faults inside the gas insulated bus ducts especially in the presence of metallic particles. In this paper, VFTOs have been estimated at various locations using EMTP in a 1100kV rated GIS during disconnector switching operations. For the substation studied, the maximum computed overvoltage is 1.76p.u without considering the trapped charge on the bus bar and it reaches 2.54p.u with a trapped charge of −1p.u. Major frequency components in the computed VFTO lie in the range of 800kHz to 15MHz. Studies on mitigation of VFTO by the use of damping resistors in the disconnector showed that a resistance close to 500Ω gives the best results. For the bus sections with trapped charge, increasing the resistance value above 500Ω results in a negative peaking of VFTO. Transient radiated fields through the bushings of the GIS are also studied for electro magnetic compatibility (EMC) design of the substation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.