Abstract
This paper focuses on the planning and scheduling problems in disassembly systems, in which used or end-of-life products are disassembled into basic parts and subassemblies for both economic and environmental reasons. The disassembly planning includes product representation, disassembly sequencing with disassembly level and end-of-life options, and related product design/redesign issues, while the disassembly scheduling is the problem of determining the order quantity of the used product to fulfil the demand of disassembled parts and subassemblies. This paper presents a review of the state-of-the-art articles and suggests the corresponding further research directions. The research directions suggested in this paper can be summarized as
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.