Abstract

The article presents a method for a comprehensive evaluation of the activities of an aircraft building enterprise. Based on an integral presentation of management principles ‘just in time, risks management’ and ‘design to cost, risks management’, an assessment of the required quality and volume of production is proposed, considering the aggregated nature of indicators and the heterogeneous structure of the enterprise. An automation algorithm for the developed method is described. The methodology for implementation and use of the tool for comprehensive assessment of the aircraft building enterprise is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.