Abstract

ABSTRACT Cable shovels are on the top priority of the most widely used machinery in open-pit mining industry, the automation of which offers great potential to improve both production efficiency and equipment reliability. Rational evaluations of digging force and power consumption serve as one of the fundamental techniques of realising autonomous operation of cable shovels. In this study, because of the wide range of digging parameters in theoretical calculation, the method of simulation is used to narrow the range of digging parameters in theoretical calculation, so that the digging force can be accurately and efficiently predicted by the method of theoretical calculation. Furthermore, scale-model-based experiments were taken in order to validate the effectiveness of the simulation results. Conclusively, although the theoretical calculation can numerically predict the power consumption in an acceptable extent (), the fitted value of unit resistance to excavation for the theoretical calculation was out of its empirical value range according to the classical theory applied to the prediction of digging resistance in the design of cable shovel. On the other hand, the simulation results were shown to be highly consistent with the experimental results (), which demonstrate the efficiency of the simulation method in evaluating dynamic working performance of cable shovels.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.