Abstract

Delivering organizational change through interorganizational projects is a complex process, as several organizations must collaborate. The aim of this article is to understand how change and resistance are shaped in interorganizational projects. This article discusses a longitudinal case study (2012–2016) of an interorganizational project in the utility sector. The findings of the study describe four practices that both enabled and constrained change. The contribution of the article is an extension of our understanding of change and resistance in projects with the introduction of the notion of productive resistance and the notion that employees can be change agents and middle managers can be resisters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.