Abstract

Diaphragm wall construction is used extensively in Europe and a special plant has been developed for excavating the trench using fluid mud to support the walls. Various types of grab reverse-circulation excavating machines are described and illustrated and specifications are quoted for the quality of the slurry. The normal procedure is to backfill the trench with tremie concrete around a reinforcement cage. Alternatively, precast concrete panels may be used or cement may be added to the bentonite for hydraulic cut offs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.