Abstract
Diaphragm wall construction is used extensively in Europe and a special plant has been developed for excavating the trench using fluid mud to support the walls. Various types of grab reverse-circulation excavating machines are described and illustrated and specifications are quoted for the quality of the slurry. The normal procedure is to backfill the trench with tremie concrete around a reinforcement cage. Alternatively, precast concrete panels may be used or cement may be added to the bentonite for hydraulic cut offs.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.