Abstract

Currently the water supply system in the municipality of Corinto (Cauca) in Colombia provides drinking water to the entire urban and rural population of the municipality. In order to provide drinking water to the entire population, it became necessary to optimize and/or expand the existing water treatment plant. The article presents an assessment of the consideration of two optimization options: the need for reconstruction of existing water treatment facilities or the construction of additional water treatment units. A reasonable proposal was made to expand the station by building additional water treatment units, including advanced modern water treatment technologies, such as coagulation, flocculation, sedimentation, filtration, sorption, settling using thin-layer modules and disinfection, based on the survey (diagnostics), technical and economic analysis, analysis of the efficiency of the existing water treatment plant, taking into account the quality of drinking water preparation, confirmed by the analysis of samples, the results of physical, chemical and microbiological tests, indicating the optimal quality of drinking water for human consumption. The use of modern water treatment technologies will allow to achieve the required quality of purified sufficient water for drinking purpose.

Highlights

  • The water supply system in the municipality of Corinto (Cauca) in Colombia provides drinking water to the entire urban and rural population of the municipality

  • The article presents an assessment of the consideration of two optimization options: the need for reconstruction of existing water treatment facilities or the construction of additional water treatment units

  • A reasonable proposal was made to expand the station by building additional water treatment units, including advanced modern water treatment technologies, such as coagulation, flocculation, sedimentation, filtration, sorption, settling using thin-layer modules and disinfection, based on the survey, technical and economic analysis, analysis of the efficiency of the existing water treatment plant, taking into account the quality of drinking water preparation, confirmed by the analysis of samples, the results of physical, chemical and microbiological tests, indicating the optimal quality of drinking water for human consumption

Read more

Summary

Introduction*

In the municipality of Corinto (Cauca) in Colombia, it became necessary to implement alternatives to improve water for human consumption, to develop different operations and processes that allow the purification of raw water, ensuring priority welfare of the population, all this in order to reduce the spread of diseases transmitted by untreated water. The focus of this document is to design several optimizations for Corinto municipality potable water treatment plant in Cauca, Colombia through the diagnosis of the processes and operations carried out in the plant and optimization alternatives [1; 2]. Using either the current hydraulic configuration of units or designing new units as a basis for the improvement of the old one, to increase the coverage of treated water for the future generations [3].

Methodology
Result
Recommendations
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call