Abstract
Despite the technical challenges in properly accommodating distributed generation (DG), one of the major and well-recognized benefits is the ability of DG to defer future demand-related network investment. It is, however, often poorly represented in existing planning approaches and analysis ignores the potential security of supply benefits. Here, a novel, more integrated, approach is presented wherein reinforcements required by system security standards (e.g., N - 1) are also taken into account. The DG contributions to system security provided by U.K. Engineering Recommendation P2/6 are adopted, enabling the methodology to quantify the deferment produced by DG considering both demand growth- and system security-related investment. The methodology employs the successive elimination algorithm together with multistage planning and is applied to a generic, meshed, U.K. distribution network. Results show that, despite differences between technology types, significant economic benefits can be harnessed when strategically incorporating DG at the planning stage.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.