Abstract

At the time, development of technology and system information provide an idea in project management information system. One of industrial which growing up in Indonesia is Engineering Procurement and Construction (EPC), in this case required a system to facilitate between all stakeholders to improve their performance. Progress report on the project that was created approach using earn value analysis (EVA) system which considered cost and schedule of work as well as a productivity performance index of workers. In addition, project progress was formed by comparing between plans and realization of work which has projected since of the beginning of the project. The result on the system was provides information of progress every time through on the dashboard page input by the user. The first step of making a report on the system, started which input the project name and then step over to make the detailed work in each department or discipline in project. The data obtained were then processed by the project control team to provide information of progress project status against the top management. The establishment of information system can be stored and accessed online by all user who have been classified in the system. That information can be integrated between the top management to take a decision against the ongoing project.

Highlights

  • Innovation and technological progress in the field of industrial engineering in the development of the present impact of development in the country to facilitate the needs of the community, because it is in the present era we often see projects in large and small scale

  • In another study was developed by Anastasia Mishakova that combines two methods of project progress control with PERT and Earn Value Analysis (EVA) with the object of observation on construction project in Russia

  • The approach method used in system design is structured approach method with information system design tool using Data Flow Diagram (DFD) and database design using Entity Relationship Diagram (ERD)

Read more

Summary

Introduction

Innovation and technological progress in the field of industrial engineering in the development of the present impact of development in the country to facilitate the needs of the community, because it is in the present era we often see projects in large and small scale. To create a strong construction industry towards global competition is one of the objectives of a nation in carrying out sustainable development [1], This is influenced by increased investment in transport and energy infrastructure and construction-related industries in the mining sector, highly visible construction industry developed rapidly within the last ten years. By mid-2016 to early 2017 have been carried out evaluation and selection of strategic projects and mechanisms for accelerating development. One of the employment contract scheme to implement development projects related industries, infrastructure, and energy sectors can be done with the design build contract scheme or commonly known as the engineering procurement construction (EPC). Control of the project commonly referred to as project management. Project management is the integration of inter-workplace, scheduling and financing in a measure that aims to identify the exact problems and adjust the project plan ahead. [3]

Methods
Discussion
Conclusion