Abstract

This study was carried out to establish the remote resistance welding technology for a hot cell environment for Direct Use of spent PWR fuel In CANDU reactors (DUPIC) fuel fabrication. A preliminary investigation for a hands-on fuel fabrication outside a hot cell was conducted with consideration of the constraints caused by a welding in a hot cell. The optimum resistance welding parameters for the endplate welding process were obtained in terms of the welding current, electrode pressure, and welding time. The welds made on the basis of optimum welding parameters showed higher torque strength than those made by laser beam welding. The integrity of the welds fabricated by resistance welding was confirmed by the results of the torque test, an examination of the microstructure, and the fracture surface of the welds.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.