Abstract

THE INDONESIAN RADIATION DATA MONITORING SYSTEM (IRDMS) IS A NETWORK CATEGORIZED AS COMPLEX PROBLEMS WITH INFLUENCING FACTORS INTO A SINGLE UNIT AS MULTIPLE PROBLEMS THAT MUST SOLVE THROUGH VARIOUS APPROACHES OPTIMALLY. One of the approaches required is the application of optimization. For example, optimization is needed between the detection sensitivity of the radiation source and the number of false alarms due to the permissible background radiation by determining the operating parameters of the monitor. In addition, optimization is needed between costs and data (information) obtained through determining the influencing factors in establishing a monitoring base, namely the purpose of installation at the location (safety and security), demographics, legal subjects, resources, type (technology) detectors, and environmental radioactivity. To increase the national content for the use of the product, the problem statement of this paper focuses on developing technical specifications for the type of low-resolution gamma spectrometer-based monitor (detector) following the analytical method developed by the authors for the determination of alarms triggered by radiation from facilities and equipment. This study aims to develop IRDMS technical specifications following the needs of nuclear control and bridge the gap (transition) of acceptance of national content before the parties can accept it as SNI. This proposed technical specification was adopted from the international standard IEC 61017:2016 and modified to suit the proposed alarm determination analysis method and Indonesian conditions, including consultation with interested parties. The content of this technical specification is relatively broad in scope. It is hoped that it can be adopted by parties who must carry out environmental monitoring following regulatory criteria and with the ability to provide alarms by increasing radiation doses equivalent to natural events (especially by rain). Keywords: environmental monitoring, gamma spectrometer, regulatory oversight, early warning

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.