Design-build methods are one of the options in carrying out the construction of high-rise buildings with a high level of uncertainty from design phase to construction, which also affects the safety performance of the project itself. Therefore, a prevention standard for a high-risk event is needed based on project activities. This research was prepared using a descriptive qualitative method with expert validation process through Delphi method and completed with a questionnaire survey to conduct a risk assessment. The output in this research is a development of risk-based standard work breakdown structure for architectural work, which generated from 39 high level risk. Based on the results of the mapping of preventive and corrective actions at high-level risks, 5 types of WBS development can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of risk so that safety performance could be improved. The novelty in this research lies in the form of design-build project delivery activities which has not been widely discussed in previous work breakdown structure research and risk identification based on the activities listed on the WBS.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.