Abstract

Based on the analysis of the work of the Khazarbagh irrigation system, water use plans, the household regime of the Tupolang River, the operation mode of the pumping station–I, proposals have been developed for the partial transfer of machine irrigation lands to gravity for the zone, the Bandyhan–I subcommand pumping station. With a two–fold accumulation of water in the Tupolang reservoir up to 40-60 million m3 and the use of this water for compensation through the end part of the Khazarbag canal, the distributor P – I in the Bandyhan canal, we recommend turning off the pumping station for the period from February to the first decade of June and from September to November. At the same time, the energy savings amount to 8.38 million kWh.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.