Abstract

One of the main tasks of the foreman at the construction site is the proper execution of technical and as-built documentation. As-built technical documentation is an integral part of construction production, which is necessary to confirm the quality and scope of work performed. In the event of accidents both during the construction of the facility and during its operation, as-built documentation is considered first to identify the reasons. It is also presented in the process of putting the object into operation. A foreman at a construction site needs to solve many problems: from ordering materials and controlling the production of construction and installation works to preparingas-built and reporting documentation for each completed stage of work. At the same time, as practice shows, a shortage of staffing to solve all the necessary tasks has been identified. In this regard, some companies resort to additional human resources for engineering and technical personnel from third parties. The task of the formation and functioning of the process of staffing mainly consists of creating a system for management regulation and providing this system with highly qualified professional personnel. This task is especially acute in the case of organizational coordination of construction management regulation. Based on this, there is a steady trend towards the growth of engineering corporations specializing in the complex provision of services for organizational coordination and management regulation. The selection of a professional construction organizer as an object of construction and investment activity imposes special requirements on the formation of an effective system of construction management regulation. The staffing level is expressed in accordance with the data on the composition of administrators, employees or the auxiliary personnel of a systematized configuration of management regulation with the number provided by the staffing table established in the process of organizational design or strategic planning process. The provisions considered in the paper make it possible to identify the actual availability of workers at all stages of management regulation, including the possibility of eliminating the shortage of engineering and technical personnel by rearranging company’s own personnel, namely, to form a reserve for promotion, provide for retraining or additional training of the relevant groups of workers. In this case, the basis for the interaction of construction organizers and owners of labor resources is the process control and technical documentation.

Highlights

  • In recent years, the structure of using monolithic concrete in construction has fundamentally changed in Russia

  • There is a possibility of redevelopment of premises during operation without the risk of damaging the supporting structures, as well as the high quality of the surfaces of walls and ceilings, which reduces the amount of finishing work

  • The quality of preparation of process control and design and technological documentation affects the quality of work performed for the construction of buildings and structures and the further process of operation

Read more

Summary

Introduction

The structure of using monolithic concrete in construction has fundamentally changed in Russia. Along with the use of prefabricated reinforced concrete structures, mainly in residential and civil construction, the share of monolithic construction has increased significantly. Monolithic concrete structures have significantly changed the architectural appearance of residential, business and administrative complexes, as well as sports facilities. The main advantage of monolithic buildings over all others is the absence of seams between various building structures. There is a possibility of redevelopment of premises during operation without the risk of damaging the supporting structures, as well as the high quality of the surfaces of walls and ceilings, which reduces the amount of finishing work. It can be noted that this construction method is very costly and time consuming, requires expensive equipment, a large number of highly qualified workers and engineers

Methods
Results
Conclusion