Abstract

Micromachine gas turbine with centrifugal impellers of 10mm diameter fabricated by 5-axis micro-milling is under development at Tohoku University, in conjunction with Ishikawajima-Harima Heavy Industries Co., Ltd. (IHI), Tohoku-Gakuin University, and Sankyo Seiki Mfg. Co., Ltd. The development is currently at the stage of proving the feasibility of the gas turbine cycle by component tests. Micro-combustors have been developed for both hydrogen and methane fuel. Over 99.9% of the combustion efficiency has been realized in both combustors and the baseline configuration of the combustor for the gas turbine is set. A compressor of 10mm diameter has been developed as a micromachined turbocharger. The performance test of the micromachined turbocharger has been started, and ran up to 566000rpm, which is approximately 65% of the design speed. Compressor performance has been successfully measured along a constant speed line at 55% of the design speed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.