Abstract

High efficiency of port operation is required to succeed in the competition between port container terminals. Berth Allocation and Quay Crane Scheduling are the most important part in container terminal operations. The integrated model is formulated as a MIP problem with the objective to minimize the sum of the dwell times, where a vessel's dwell time is measured between arrival and departure including both times waiting to be berthed and servicing time while berthed. The construction of suitable mathematical model is formulated by considering various practical constraints.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call