Abstract
This paper describes the results of a study on installation of a 500kV 2000mm2 oil-filled cable on the long-span Ohnaruto suspension bridge under construction in the Seto Inland Sea of Japan, planned to carry both automobile and the Shinkansen Bullet Train traffic.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have