Abstract

Maintenance of Savannah Harbor became progressively more critical as the deepening of the channels caused heavy shoaling concentrations in a highly industrialized section of the harbor where spoil disposal areas are limited. Studies were performed to evaluate the shoaling and develop means of reducing the high cost of maintaining 31 miles of deep-water navigation channels. A hydraulic model investigation substantiated the conclusions reached through analysis of prototype data, greatly expanded the knowledge of hydraulic conditions and shoaling processes, and developed an improvement plan which involved a tide gate to induce the deposit of sediment in an off-channel sediment basin.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.