Abstract

PT X, a power generation company, hasn’t been able to meet their target in the business development segment over the past few years. This is due to a problem detected in their Project Portfolio Management, in which PT X’s project selection method hasn’t considered the ambiguity nature of project’s information and risks. This study is going to develop a project selection method for PT X using MCDM (multi criteria decision making) with BOCR (benefit, opportunity, cost, risk) Concept to evaluate many criteria that need to be considered by the company, especially conflicting criteria such as benefit with cost and opportunity with risk. Not only that, hesitant fuzzy will be used because project itself has many uncertain or ambiguous information, so stakeholder will face difficulties in determining the value for the evaluation. From the integration of those things in this study, it is found that for PT X, Benefit has the biggest priority, followed by Opportunity, Risk, and Cost in Project Selection for PT X. It is also found that based on additive-BOCR, Project C gives the optimal value for PT X, followed by Project B, Project A, Project D, dan Project E.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.