Abstract
The present state of geothermal power engineering in Russia and prospects for its development are considered. An assessment is given of the projects of constructing a pilot binary geothermal power plant in Kamchatka, developing geothermal heat supply systems in the town of Vilyuchinsk and settlement of Rozovyi, and increasing the installed capacity of the Mutnovsk geothermal power station, which are the top-priority projects implemented by OAO RusGidro with scientific and technical support from ZAO GEOINKOM and ZAO Geoterm-EM.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.