Abstract

Traditional methods to protect the electric-driven facilities from overload or short circuit usually use electronic breaker or fuse. However, the reaction time for these devices normally require mo...

Highlights

  • An increasing growth in world economics has posted a tremendous demand for electrical power

  • The fuse is installed in series with the triac

  • When alternating current (AC) is short-circuited by pressing the button switch A, the triac cuts AC power instantly but the fuse does not burn out

Read more

Summary

Introduction

An increasing growth in world economics has posted a tremendous demand for electrical power. The shortcircuit fault current is, probably, the most destructive event in the power distribution systems.[1] The current can abruptly rise more than 20 times the maximum nominal value. A fuse is a simple, cheap, and small-sized protective device that can be used to interrupt fault currents.[2,3] it is unrecoverable due to being a single-use device, and its reaction time may be longer than expected in some circumstances. The electronic breaker (EB) is known as the most widely used devices to protect the facility from overload in industry.[4,5,6,7] EB can be reset automatically, it has a limited lifetime, number of cycles, and long reaction time.[8,9] High cost to cope with the rising fault current levels is another disadvantage.

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.