Abstract

In the seismic design of nuclear power plant, it is recently considered to apply the probabilistic method in addition to the deterministic method. The deterministic method secures the seismic safety of a nuclear power plant by veryfying that the calculated stress on the equipment is lower than allowable stress in the design criteria. The seismic probability safety assessment (Seismic PSA) method secures seismic safety by veryfying that the probability of reactor core failure is lower than a certain value. In seismic PSA, it is important to estimate the fragility of the equipment for precise assessment. Therefore, in this paper we dealt with a method using the Bayesian approach to generate a fragility curve of power plant from a multi-specimen test, and investigated the influence of the sample size driving the fragility evaluation test

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.