The approach to a choice of a new mine design and technical upgrade of operating coal mines is substantiated. The choice of the option is made in the following way: the elements of the mine technological system are defined, for each element of the system two levels of costs are allocated – capital and operational; a graph of alternative options of the system is formed by matrix enumeration taking into account the possibility of simultaneous application of different elements, up to 10 000 scenarios are formed; capital and operating costs of options are estimated in the form of coefficients as the cost-to-cost ratio in the base variant, which has already been implemented and the costs of which are already known; ranking of the options at the level of costs and the definition of the 10 preferred are performed. It is established that the application of partial enumeration allows the costs relative to the base variant to be reduced by 10 %; the main constraint of costs reduction is the need to comply with all conditions that ensure industrial safety.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.