Abstract

AbstractThis paper presents an experimental investigation to determine the embedment length required for longitudinal reinforcement in a bridge column extending into an oversized pile shaft, and the amount of transverse reinforcement required for the pile shaft to prevent premature bar anchorage failure due to concrete splitting induced by bar slip. Four full-scale column–oversized pile assemblies were tested under quasi-static cyclic lateral loading. The test specimens had different embedment lengths for the column reinforcement, different amounts of transverse reinforcement in the piles, different sizes of longitudinal bars, ranging from No. 8 to No. 18 (25 to 57 mm) bars, and different column-to-pile diameter ratios. All column–pile assemblies behaved in a ductile manner with plastic deformation occurring near the base of the columns despite some cone-shaped fractures and tensile splitting cracks occurring in the top portion of the piles. The test results show that the embedment length for the column r...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.