Abstract
Introducing a Transmission Based Train Control signalling system on London Underground's Northern Line facilitates an appreciable increase in train service frequencies, impacting the existing 630 V DC 'four rail' traction power system. Extensive operational and traction power simulation modelling was undertaken to investigate train voltage regulation especially under electrical outage and perturbed operating conditions. Traction power system upgrade options were developed comprising 'low loss' Composite Conductor Rail (CCR), increasing system voltage to 750 V, and parallel cabling. The upgrade options were evaluated in terms of equipment quantities, costs, installation programmes, and energy losses (including tunnel environmental impacts), and a single option taken forward for implementation. (5 pages)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.