Abstract

This paper proposed the development of Alternative-Remote Terminal Unit (A-RTU) for data speed, data security, data validation, and data control management. Each development was essential to implement a reliable and systematic process of ARTU device for a general purpose in Electric Vehicles like electric cars. The data speed was achieved by reducing the arrival and departure time based on hardware designation, the data security was prevented from energy theft for an unlimited area, the data validation process was validated based on parameter use only; and data control management was controlled and managed based on the sub-component of RTU for a general purpose use. The A-RTU was implemented by combining the Programmable Integrated Circuit (PIC), Field Programmable Gate Array (FPGA) and Field Programmable Analog Array (FPAA), and Real Time Digital Simulator (RTDS) using area code of each state to unlimited area, validating the battery State of Charge (SOC) parameter, and controlling and managing the battery charging and discharging process, and the remote device process based on MATLAB Simulink. The findings should reduce the arrival and departure time for less than milliseconds to increase the data speed that were being sent and received.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.