Abstract

In recent years, demand for utility tunnels in urban underground areas, which accommodate various lifelines such as electric power, communication, water supply, heating, gas, and so on, is increasing. However, unlike domestic manuals that are focused on utility tunnelmaintenance, disaster prevention measures implemented during the construction stage have been institutionalized overseas. In view of this, in order to secure safety related to the construction of utility tunnels in Korea, it is necessary to mitigate large-scale construction disasters that reflect the characteristics of underground urban utility tunnels. In this study, activity diagrams based on crisis warning phases of fire, inundation, and earthquake disasters were created to reduce the damage caused by each disaster. The activity diagrams are expected to contribute to the safety assurance in the event of a large-scale construction disaster during the construction of utility tunnels by effectively and promptly responding to each phase of the disaster.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.